Restaurant Prime Cost Explained: Formula, Target and How to Lower It
By the getodit.com team · November 19, 2026 · 6 min read
Short answer: prime cost is your food and beverage cost plus your total labor cost, divided by sales. Many operators try to keep it near 60% to 65% of sales. It matters because these two costs are the biggest in a restaurant and the ones you can change week to week. If prime cost is too high, there is not enough left to pay rent, other bills and yourself.
What is prime cost?
Prime cost combines the two costs that every restaurant has and that move with how you run the kitchen and the floor:
- Food and beverage cost (cost of goods sold, or COGS)
- Labor cost, including wages, salaries, payroll taxes and benefits
Rent and utilities are important, but they are mostly fixed. Food and labor are the costs you can adjust through purchasing, portions, scheduling and menu design.
The formula
Prime cost = COGS + Total labor cost
Prime cost % = (COGS + Total labor cost) ÷ Net sales × 100
Use net sales, which means sales after discounts and comps, and use the same period for all three numbers.
What to include
| Part | Include | Leave out |
|---|---|---|
| COGS | Food, beverage, and the cost of items consumed in the period | Cleaning supplies and smallwares (they belong in other expenses) |
| Labor | Hourly wages, manager salaries, overtime, paid time off, employer payroll taxes and benefits | Customer tips paid directly to staff |
| Sales | Net sales for the same dates | Sales tax collected, gift card sales before use |
The most common mistake is leaving out payroll taxes and benefits, or manager salaries. That makes prime cost look better than it is, often by several points.
A worked example
This is an illustrative month for a casual restaurant, using round numbers to show the method.
| Item | Amount |
|---|---|
| Net sales | $62,000 |
| Food and beverage cost (COGS) | $18,600 |
| Hourly wages | $15,400 |
| Manager salaries | $5,200 |
| Payroll taxes and benefits (12%) | $2,472 |
- Total labor: $15,400 + $5,200 + $2,472 = $23,072
- Prime cost: $18,600 + $23,072 = $41,672
- Prime cost %: $41,672 ÷ $62,000 = 67.2%
Food and beverage cost is exactly 30% of sales, which is healthy. Labor is 37.2%, which is high. The combined 67.2% is above the common target range, so the restaurant has about 32.8% of sales left for rent, utilities, marketing, insurance and profit. The labor cost calculator does this calculation and also shows sales per labor hour.
What is a good prime cost?
| Prime cost % of sales | How it is usually read |
|---|---|
| Under 60% | Strong. Leaves room for rent and profit. |
| 60% to 65% | A common target range. |
| Above 65% | Tight. Review food cost and scheduling. |
These are rules of thumb. A fine-dining restaurant with expensive ingredients and a large team may run higher, while a counter-service concept may run lower. Compare yourself with your own history first, and with industry ranges second.
Why prime cost beats looking at food or labor alone
A restaurant can have an excellent food cost and still lose money because labor is heavy, or the other way around. Looking at the two together shows the trade-off. For example, a kitchen that cooks more from scratch may raise labor and lower food cost. A kitchen that buys more prepared items does the opposite. Prime cost tells you whether the net effect is good.
How to lower prime cost
You can lower prime cost from the food side, the labor side or the sales side.
Food and beverage side
- Cost every recipe, and re-cost when prices change. Use the recipe costing calculator.
- Control portions with scales and scoops.
- Cut waste with par levels and a waste log.
- Read our guide on how to lower food cost for a full checklist.
Labor side
- Schedule to sales, not to habit. Compare sales per labor hour by day and shift, and find the hours that are overstaffed.
- Reduce overtime. Spread hours more evenly and plan ahead for busy periods.
- Cross-train. Staff who can cover two stations let you run a smaller crew.
- Right-size manager hours. Check whether salaried managers are covering shifts that hourly staff could handle, or the reverse.
- Review turnover. Hiring and training cost money. Better retention lowers both.
Sales side
- Raise the average check with better menu design and suggestive selling.
- Fill slow periods with promotions that do not discount your best sellers.
- Raise prices modestly when ingredient and wage costs rise. Prime cost is a percentage of sales, so higher sales on the same cost base lower the percentage.
How often to check it
Weekly is the most useful rhythm. Many operators prepare a short weekly report with sales, COGS, labor and prime cost, and compare it with the same week last month and last year. Seeing a rise of two points in one week is easy to fix. Finding it at month end is not.
Common mistakes
- Mixing periods. Sales from one week and payroll from another gives a misleading result.
- Leaving out costs. Include payroll taxes, benefits and manager pay.
- Counting tips as your cost. Tips that customers pay to staff are not your cost. Employer taxes on those tips are.
- Reacting to one week. Look at trends over several weeks before making large changes.
Put it together
If your sales and expenses are in a spreadsheet, the Restaurant P&L Analyzer calculates prime cost, labor and food cost together, charts them by month and points out what looks off. It runs in your browser, so your file stays on your device. To see how prime cost connects to your break-even point, use the break-even calculator.